BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2021 at 8:00 PM

Updated February 4, 2025

Site work for a bridge / tunnel in Keg River, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Deck Replacement, Bridge Deck Waterproofing, Bridge Painting, Bridge Rehabilitation and Other Work, 2:60 to 62, B.F. 75946E, Existing Arch Bridge over Peace River, Peace River Peace Region APPROXIMATE QUANTITIES: 1 Lump sum Demolition and Disposal of Bridge Structure - Abutments 1 Lump sum Demolition and Disposal of Bridge Structure - Approach Spans 1 Lump sum Demolition and Disposal of Bridge Structure - Arch Spans 1 Lump sum Pier Cap Partial Reconstruction 1 Lump sum Structural Steel - Supply and Fabrication, Delivery and Erection 1,752 Cubic metres Concrete (Class HPC) - Supply and Place 342,524 Kg Corrosion Resistant Reinforcing Steel - Supply 1 Cubic metres Bearings - Supply and Fabrication, Delivery and Installation - Elastomeric Bearings 1 Cubic metres Bearings - Supply and Fabrication, Delivery and Installation - Rocker Bearings 6,056 Square metres Deck Surface Preparation for Waterproofing 6,056 Square metres Waterproofing 1 Lump sum Bridgerail - Supply and Fabrication, Delivery and Installation 1 Lump sum Bridge Lighting 4,000 Cubic metres Common Excavation 2,100 Square metres Geogrid - Supply and Install 1 Lump sum Supply and Install Barrier Guard 800 Gate System or Equivalent 840 Tonnes Asphalt Concrete Pavement 1,820 Square metres Cold Milling Asphalt Pavement 1 Lump sum Removal of Detours and Site Restoration Contractor to supply all materials.

Award

Bridges / Tunnels

$29,652,000.00

Public - State/Provincial

Site Work

172

1

63

7

Subscribe For Documents

147 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
64
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2021

May 4, 2021

Project location map

Multiple Locations, Keg River, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.