BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2021 at 8:00 PM

Updated September 11, 2024

Site work for a civil project in Keg River, Alberta. Completed plans call for site work for a bridge / tunnel.

Bank Protection and Other Work HWY 49:08 - Smoky River Bridge Peace Region APPROXIMATE QUANTITIES: 9,700 Cubic Metres Common Excavation 18,500 Tonnes Backfill - Crushed Aggregate ( Des 2 Cl 40) 6,500 Tonnes Heavy Rock Riprap (Modified Class 3 Slope Riprap) - Install 9,400 Tonnes Heavy Rock Riprap (Modified Class 3 Apron Riprap) - Install 400 Square Metres Geotextile Installation - Gabions Contractor to supply all materials.

Award

Bridges / Tunnels

$3,623,532.00

Public - State/Provincial

Site Work

10

1

6

7

Subscribe For Documents

126 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
4
Bidding Soon
94
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2021

March 1, 2021

Project location map

Multiple Locations, Keg River, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.