BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2021 at 8:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a water / sewer project in Fort Smith, Arkansas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The project includes construction and demolition activities associated with the installation of a new Peracetic Acid Disinfection System at both the P Street and Massard Water Reclamation Facilities. Bidders are to include their Arkansas License number on the outside of their sealed bid. Bids shall only be received from registered Bidders. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed under the terms of Act 150 of the 1965 Acts of the Arkansas Legislature, including subsequent amendments, and considered by the Arkansas Contractors Licensing Board to be classified as a General Contractor for the classification required to perform the work identified as part of the project. The City of Fort Smith encourages participation of small, minority, and woman owned business enterprises in the procurement of goods, services, and construction, either as a general contractor or subcontractor. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The City of Fort Smith is an Equal Opportunity Employer Male/Female. Each BIDDER must inform himselffully ofthe conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful BIDDER of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the contractor, in carrying out his work, must employ such methods or means as will not cause any interruptions ofor interference with the work of any other contractor. ENGINEER will make visits to the site at intervals appropriate to the various stages of construction to observe the progress and quality of the executed Work and to determine, in general, ifthe Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. ENGINEER'S efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations as an experienced and qualified design professional, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defects and deficiencies in the Work.

Under Construction

Water / Sewer

$1,506,366.00

Public - City

Demolition, New Construction, Site Work

58

1

19

10

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2021

March 11, 2021

Project location map

Multiple Locations, Fort Smith, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.