BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2021 at 8:00 PM

Updated March 20, 2024

Renovation of a water / sewer project in Pasco, Washington. Completed plans call for the renovation of a water / sewer project.

This is a phased project. The total number of phases is not disclosed. As of February 19, 2021, Bidding for contractor is being evaluated. A designer is identified. Construction for Phase 1 of the project is anticipated to start April 2021, and will take around 540 working days. The followingis for historical purposes: Project Estimate: $19,500,000.00 to $22,500,000.00 This project consists of improvements and modifications to the City's existing municipal wastewater treatment plant (WWTP) which includes furnishing all labor, materials and equipment necessary for the construction of new primary effluent structures and piping, two new aeration basins, alterations to two existing aeration basins, a blower building expansion, addition of two new blowers, modifications to two existing blowers, RAS pump system distribution improvements, a new effluent flowmeter facility, approximately 1,150 feet of new 42-inch diameter outfall piping, new primary power switchgear, associated electrical and control systems, associated site work and yard piping, and other appurtenances as necessary to complete the Project. The WWTP improvements also include the demolition of the existing trickling filter and select items. The City of Pasco is an equal opportunity and affirmative action employer. Small, minority- and women-owned businesses are encouraged to submit bids. No person shall be excluded from participation, denied program benefits, or subjected to discrimination on the basis of age under any program or activity receiving federal funding assistance. (42 U.S.C. 610 et. Seq.). The City of Pasco in accordance with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by e-mailing Dustin Wittman at wittmand@pasco-wa.gov or calling 509-545-3447. The City of Pasco in accordance with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. Technical questions regarding the scope of this project should be put in writing and directed to Jon Padvorac, Project Manager; email: padvoracj@pasco-wa.gov. The City reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved make the award to best serve the interests of the City of Pasco. The project value listed reflects the total project estimate. Project Estimate: $ 19.5 to 22.5 million..

Award

Water / Sewer

$16,517,300.00

Public - City

Renovation

862

1

195

15

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
20
Bidding Soon
397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2021

July 6, 2021

Project location map

1015 S Grey Ave, Pasco, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.