BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Santa Clarita, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of two 500,000-gallon steel welded recycled water tanks and site development, including earthwork, piping, electrical, SCADA improvements and appurtenances. Type of Award Lump Sum Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q and A Deadline 01/26/2021 5:00 PM Construction of the Recycled Water Tanks at Cherry Willow (Phase 2B). This project is located in the City of Santa Clarita, CA. and generally consists of the construction of two recycled water tanks to store tertiary-treated recycled water from the Vista Canyon Water Factory. The work includes, but is not limited to site grading, installation of two 55-ft diameter welded steel tanks with stairs and an access bridge between the two tanks, site lighting for the tanks, AGENCY electrical equipment and Southern California Edison equipment, replacement of existing SCADA panel, approximately 160 linear feet of 12-inch recycled water, 130 linear feet of 12-inch potable water and 460 linear feet of 12-inch storm drain piping that connect to existing utilities within the existing access road, flexible expansion joints connecting to the tanks, seismically controlled inlet/outlet valves, air valves, sampling taps, valves, and all other necessary appurtenances; and all associated work ("Work") as indicated in the Contract Documents.

Bid Results

Water / Sewer

$3,906,870.00

Public - City

New Construction, Site Work

91

1

45

9

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
231
Bidding Soon
3,647
All Active Projects
1,674
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2021

April 7, 2021

img_map_placeholder

Cherry Willow Dr, Santa Clarita, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.