Demolition and site work for a bridge / tunnel in Long Beach, California. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than March 23, 2021, at 5 p.m. The Work required by this Contract includes, but is not limited to, the following: Furnish all labor, transportation, materials, equipment, design services, environmental controls and monitoring necessary for the demolition of the existing Gerald Desmond Bridge, but not limited to: mobilization, bridge demolition, removal, and disposal, including lead paint mitigation, temporary traffic control and maintenance, and other work as required. See Section 01 10 00, Summary of Work in the Technical Specifications. 1. Mobilization/demobilization; 2. Hydrographic surveys of the channel; 3. Bridge demolition, removal, and disposal, including lead paint mitigation and asbestos abatement and removal; 4. Construction and installation of temporary debris containment systems and protection of existing adjacent facilities, including active, idled and abandoned oil wells, to prevent damage from bridge demolition activities, and subsequent removal; 5. Construction and installation of temporary falsework towers and other supports needed to maintain stability of the bridge throughout its demolition, and subsequent removal; 6. Construction of access roads, site controls and access points; 7. Temporary traffic control and maintenance, temporary waterway traffic control and maintenance, and temporary railroad work plan and track protection; 8. Demolition, removal and disposal of abandoned utilities and all other appurtenances on the bridge; Shimmick Construction has a required certification form that subs must turn in with their bid. 9. Excavation, segregation, onsite placement and offsite disposal of non-contaminated soil, and offsite disposal of contaminated material; 10. Backfill of excavations and general grading; 11. Final grading of onsite materials; 12. Implementation of storm water management systems; 13. Construction of temporary facilities; 14. Installation of fencing and gates Pre-Bid Questions. All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than March 23, 2021, at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. Estimated Bid Value $34.7M to $83.7M - See Authority to Advertise Board Memo Per ITB-1.1 Contract Time and Liquidated Damages. The Contractor shall achieve Substantial Completion of Work within 733 calendar days and Affidavit of Final Completion of the Project within 838 calendar days as provided in Paragraph SC - 6.1 of the Special Conditions, from a date specified in a written "Notice to Proceed" issued by the City and subject to adjustment as provided in Section 8.2 of the General Conditions. Online Q&A Yes Q&A Deadline 04/20/2021 5:00 PM (PDT) Addendum #1-#4 have been issued.

Bid Results

Bridges / Tunnels

$27,511,546.00

Public - City

Demolition, Site Work

2073

69

78

7

Subscribe For Documents

144 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,394
All Active Projects
936
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

June 28, 2021

img_map_placeholder

I-710, Long Beach, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.