Published June 2, 2021 at 8:00 PM

Updated December 10, 2024

Site work and new construction of a fire / police facility in Covington, Georgia. Completed plans call for the construction of a fire / police facility.

This a new Fire Station Project that is a prototype fire station that is approximately 9,500 sq. ft. Currently, the same prototype is under construction on the North side of Newton County. This project consists of grading, storm drainage, curb and gutter, paving, concrete walks, wood framed walls and trusses , cmu exterior/interior walls, brick veneer, concrete slabs on grade, asphalt roofing, hollow metal doors and frames, finish hardware, aluminum storefront and glazing, drywall, carpet, lvt, tile, drywall ceilings, cementitious siding, painting, casework, plumbing, fire protection, hvac, fire alarm replacement, and electrical. Questions Due Date: Jan 29th 2021, 12:00 PM EST Any inquiries regarding this RFQB must be submitted in writing no later than 12:00 Noon, E.S.T. Friday, January 29, 2021 to: Newton County Purchasing Office, Attn: Randi Fincher, 1113 Usher Street, Suite 204 Covington, GA 30014 or email: rfincher@co.newton.ga.us. Questions will be answered at the mandatory pre-submission conference and/or in writing by addendum. Questions received after noon on Friday, January 29, 2021 will not receive a response. FIRE STATION NO. 4. (9,150 SF Building Area, 11,784 SF Roof Area) - Three Apparatus Bays - Cascade Room - Decontamination Area - Living Space (Kitchen, Dinning, Living, Bathrooms, and Bunk Rooms) Pre-Construction / Mobilize (March 03 - 31, 2021) - GC and Newton County Execute Agreement and receive Performance and Payment Bonds - Newton County Issues Notice to Proceed - GC integrates his sub-contractors with their design team - Construction Packaging and Sequencing is developed and presented to Newton County - GC Mobilizes to Site with Job Trailer and Superintendent Construction / Post Construction Phases (April 01, 2021 - April 01, 2022) - Complete remaining Construction Documents - Achieve Final Permits on Vertical Packages - Start and Complete Vertical Construction Packages - Substantial Completion date of; March 01, 2022 - Final Completion date of; April 01, 2022

Under Construction

Fire / Police

$2,652,155.00

Public - County

New Construction, Site Work

62

26

14

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
96
Bidding Soon
2,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2021

April 1, 2021

Project location map

1200 County Rd 213, Covington, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.