BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bonham, Texas. Completed plans call for site work for a water / sewer project.

https://www.spartnerships.com/newsletter/current/tgi.html Updated demands and need for redundancy have accelerated the need for the North Texas Municipal Water District (NTMWD) to implement the second phase of the Bois d' Arc Lake Program Phase 2 expansion. NTMWD will host a mandatory pre-bid meeting at 1 p.m. February 15 for a construction manager at risk (CMAR) on the project that will consist of: A second 70 million gallons per day (MGD) phase of the Leonard Water Treatment Plant for a total capacity of 140 MGD. Expansion of the Bois d' Arc Lake (BDL) Raw Water Pump Station (RWPS) located downstream of the BDL dam embankment, between the dam and the service spillway. A new High Service Pump Station - South (HSPS-S) in addition to expansion of the High Service Pump Station - North (HSPS-N) which is currently under construction. Addition of a second cell of 210 million-gallon capacity at the Terminal Storage Reservoir at the Leonard plant site. Bois d'Arc Lake is the first new major reservoir in Texas in nearly 30 years. The 16,641-acre lake will be located northeast of the city of Bonham in Fannin County. Based on the preliminary work done to date, the conceptual construction cost value of this project is $436 million, and the contract is contingent upon release of funds from the Texas Water Development Board (TWDB). NTMWD officials anticipate substantial completion by December 2026. _______ Procure and install the fencing, gates, and miscellaneous items per the bid package documents. Proposal Package 8 Dam Fencing Subcontractor shall perform all work and shall furnish all supervision, labor, materials, layout, hoisting, tools, equipment, supplies, shop drawings, samples, bonds, insurance and all other things necessary for the construction and completion of the work described above and work incidental thereto (collectively, the "Subcontractor's Work"), in strict accordance and full compliance with the Contract Documents (the "Contract Documents" consist of this Agreement, the Prime Contract between the Owner and Contractor ("Prime Contract"), and all conditions, requirements, specifications, drawings, and addendum thereto (collectively the "Prime Contract Documents"), and all modifications to any of the Contract Documents). This Agreement is contingent upon the Contractor entering into the Prime Contract with the Owner and contingent upon the Owner's approval and acceptance of the Subcontractor. Subcontractor is not authorized to perform any Work under this Agreement until Contractor enters into a Prime Contract with Owner and any work performed or preparations to perform work by Subcontractor prior to such time shall be at the sole expense of Subcontractor. Subcontractor's Work is not limited by any titles on the drawings or headings in the specifications, it being the intention of the parties that all work customarily performed with Subcontractor's Work and required by the Contract Documents shall be performed by Subcontractor, including any and all items and services consistent with, contemplated by and reasonably inferable from the Contract Documents, whether or not such items and services are specifically mentioned therein. Subcontractor shall proceed with Subcontractor's Work in accordance with Contractor's schedules as amended by Contractor from time to time. Contractor shall have the right to direct the sequence and pace of Subcontractor's Work, including overtime, without monetary compensation to Subcontractor. Subcontractor shall supply sufficient labor, equipment and material to enable Contractor, Owner and all other subcontractors to complete the construction of the entire Project in the time required by the Prime Contract between the Owner and Contractor. The Subcontractor shall furnish to the Contractor in such detail and as often as required, full reports of the progress of the Subcontractor's Work irrespective of the location of such Subcontractor's Work.

Post-Bid

Water / Sewer

$750,000.00

Public - State/Provincial

Site Work

29

1

10

7

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
63
Bidding Soon
3,369
All Active Projects
1,340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2021

March 25, 2021

img_map_placeholder

To Be Determined, Bonham, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.