BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Eden, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

For MGM Warehouse Sanitary Sewer Rehabilitation Each proposal shall be accompanied by a cash deposit or certified check, drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, in an amount equal to not less than five percent of the proposal. In lieu thereof, the bidder may offer a bid bond of five percent of the bid prepared on the Bid Bond form contained within the Contract Documents or a Surety Company's Standard Bid Bond form, duly executed by the Bidder as principal and executed by a surety company licensed under the laws of North Carolina to execute such bonds and listed in the latest issue of U. S. Treasury Circular 570, conditioned that the surety will, upon demand, forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 90 days. Bidders must comply with the President's Executive Order No. 11246, as amended, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction promulgated under the Occupational Safety and Health Act of 1970 (PL91 596) and under Section 107 of the Contract Work Hours and Safety Standards Act (PL91 54), or latest revisions. General Contractors are notified that "An Act to Regulate the Practices of General Contracting" ratified by the North Carolina General Assembly on March 10, 1925, and as subsequently amended will be observed in receiving bids and awarding General Contracts. All Equipment/Manufacturer "Or-Equal" Qualification Packages, per Paragraph 11.0 of the Instructions to Bidders (Document 00 21 13), must be submitted at least ten days prior to the advertised bid date. The Owner reserves the right to reject any or all bids and to waive informalities and technicalities.

Award

Water / Sewer

$1,398,754.00

Public - City

Renovation, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
54
Bidding Soon
1,325
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2021

March 26, 2021

img_map_placeholder

572 S New St, Eden, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.