EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2021 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Concord, California. Completed plans call for the renovation of a educational facility.

Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. The Project consists of: The repair, replacement and/or refurbishment of school roofs, gutters and associated work at the following four elementary school locations: El Monte, Meadow Homes, Walnut Acres, and Woodside. Contract documents must be supplied without delay in order to meet a mobilization date no later than June 4, 2021. Substantial completion means all HOT WORK needs to be 100% complete. Work is expected to be substantially completed by August 3, 2021. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: B and/or C-39. The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. COVID-19 SITE WALK SAFETY PRECAUTIONS WILL BE ENFORCED The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount only hot applied, including Add/Alts if applicable; or The base bid amount only cold applied, including Add/Alts if applicable; or The base bid amount only of a combination hot and cold applied, including Add/Alts if applicable. Last addenda to be issued not later than 72 hours prior to bid opening date and time, therefore all questions are due no later than 5 business days prior to the bid opening.

Bid Results

Educational

$2,394,147.00

Public - County

Renovation

7

13

12

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Natural Roof Coverings, Membrane Roofing, Modified Bituminous Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
108
Bidding Soon
2,165
All Active Projects
961
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2021

June 8, 2021

img_map_placeholder

Multiple Locations, Concord, CA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Summer Roofing Project Package #1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.