EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2021 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Canton, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Project Questions Call: Preston Friend 205 Ne Loop 564 Mineola, Tx 75773 903/569-2349 Length: 0 Mi Time for Completion: 233 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Van Zandt 0910-12-134 Cr 2918 at Steve Creek Relief Cr Br 2019(360) Str Aa2918101, 1.25 Mi S of Fm 1256 Length: 0 Miles Van Zandt 0910-12-135 Cr 2918 at Steve Creek Relief Cr Br 2019(361) Str Aa2918102 1.35 Mi S of Fm 1256 Length: 0 Miles Van Zandt 0910-12-136 Cr 2319 at Alligator Creek Cr Br 2019(362) Str Aa2708102,0.80 Mi W of Sh 19 Length: 0 Miles Van Zandt 0910-12-137 Cr 2708 at Caney Creek, Aa2708101 Cr Br 2019(363) 1.02 Mi N of Sh 198 Length: 0 Miles TXDOT - Bridge Replacement

Award

Bridges / Tunnels

$1,247,129.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Cleaning and Waste Management
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
57
Bidding Soon
2,916
All Active Projects
1,128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2021

May 4, 2021

img_map_placeholder

To Be Determined, Canton, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.