Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2021 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Riley Township, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

HMA Surface Course N50, HMA Leveling Binder N50 along with necessary and related work. Project Location: Payne Road, Hartman Road, and Harrelson Road Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. IDOT - HMA Surface Course N50, HMA Leveling Binder N50 - 21-16000-01-GM The amount of the check is 5% Bid Bond For the Location A, Payne Road, the work consists of the construction of a 0.75" lift of HMA Leveling Binder, MM, N50, and a 1.5" lift of Hot-Mix Asphalt Surface Course, IL-9.5, N50, along with necessary and related work as detailed in the Special Provisions and the Estimate of Quantities. For the Locations B and C, Hartman Road and Harrelson Road, the work consists of the construction of a 1.5" lift of Hot-Mix Asphalt Surface Course, IL-9.5, N50, along with necessary and related work as detailed in the Special Provisions and the Estimate of Quantities. The locations for this section is in Riley Township, McHenry County, Illinois on Payne Road, Hartman Road, and Harrelson Road with an improvement length of 18,775.0 feet. For the Location A, Payne Road, the work consists of the construction of a 0.75" lift of HMA Leveling Binder, MM, N50, and a 1.5" lift of Hot-Mix Asphalt Surface Course, IL-9.5, N50, along with necessary and related work as detailed in the Special Provisions and the Estimate of Quantities. For the Locations B and C, Hartman Road and Harrelson Road, the work consists of the construction of a 1.5" lift of Hot-Mix Asphalt Surface Course, IL-9.5, N50, along with necessary and related work as detailed in the Special Provisions and the Estimate of Quantities.

Bid Results

Roads / Highways

$297,667.00

Public - County

Paving, Site Work

6

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
652
Active Projects
280
Bidding Soon
4,752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

March 5, 2021

Project location map

Multiple Locations, Riley Township, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed