Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.
The rehabilitation, development, and equipping of two (2) potable water supply wells, Wells Commission 14 and Citizens 10, each with a design capacity of 3,000 gallons per minute (gpm) The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make award to the lowest responsible bidder as it may best serve the interest of the Owner The Contractor shall possess a valid California C-57 Water Well Drilling Contractor license at the time the Contract is awarded. The Contractor or subcontractor shall also possess a valid C-10 Electrical Contractor license at the time the Contract is awarded. Failure to possess the specified licenses may render the Bid as non-responsive. This project is a public work under Labor Code 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made available upon request This section applies to switchboards rated 600 volts and below. B. Provide Switchboard(s) as specified herein and shown on the Drawings. C. All wiring, wire color codes, wire labeling and terminal blocks within the switchboard shall be as specified in Section 26 05 70 - Low Voltage Wire and Data Cables. D. The switchboard scope of work includes: 1. Providing switchboard structure and all internal components. 2. Installation of the switchboard on concrete pad per details. 3. Submittal data and drawings. 4. Startup and configuration of switchboard internal components. 5. Factory and field testing. 6. Operation and maintenance manuals. 7. Warranty of all components. 8. Seismic Anchorage Design Calculations and conforming installation. 9. Conduit - support systems, wire, and grounding system, for equipment interconnection, and operation. 10.System calibration, testing and documentation. E. Furnish all required labor, materials, safety equipment, transportation, test equipment, incidentals and services to perform factory and/or field testing per Section 26 05 70 - Factory and Field Testing. F. All electrical equipment and materials, and methods - including installation, calibration, and testing - shall conform to the applicable codes and standards listed in this and other Sections. All electrical materials and work shall conform to published standards of the National Electric Code (NEC), Institute of Electrical and Electronic Engineers (IEEE), and Underwriters Laboratories Inc (UL). The Contractor, simultaneously with the execution of the Contract, will be required to furnish a payment bond and a performance bond, each in an amount equal to one hundred (100) percent of the Contract Price. Said bonds shall be secured from a surety satisfactory to Owner and who is authorized to transact business in California. Said bonds shall continue in full force and effect for the guarantee period. Bidders must scan and upload with their bid documents a certified check or bank draft payable to the Long Beach Utilities Department, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid. Any questions shall be submitted to Ryan Hiney at ryan.hiney@lbwater.org. Include the subject line: "Rehabilitation of Wells Commission 14 and Citizens 10 (EO-3553, WD-21-22): Question". The deadline for questions is 4:00 PM on Thursday, October 12, 2023. All questions should be submitted via email to Mr. Matthew Cruz at Matthew.Cruz@lbwater.org with the subject "Spec. No. WD-21-22 Questions".
Award
Water / Sewer
$4,320,360.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2023
December 4, 2023
Multiple Locations, Long Beach, CA
Related To This Project
Long Beach, CA
--
Long Beach, CA
Bid Date: Sep 15 2023
Long Beach, CA
Bid Date: Sep 20 2023
Long Beach, CA
Bid Date: Nov 09 2020
Long Beach, CA
Bid Date: Nov 10 2020
Long Beach, CA
Bid Date: Nov 10 2020
Long Beach, CA
Bid Date: Dec 16 2021
Long Beach, CA
Bid Date: Sep 13 2023
Long Beach, CA
Bid Date: Oct 10 2023
Long Beach, CA
Bid Date: Oct 18 2023
Long Beach, CA
Bid Date: Oct 19 2023
Long Beach, CA
Bid Date: Sep 14 2023
Long Beach, CA
--
Long Beach, CA
Bid Date: Sep 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.