Published April 14, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Manchester, New Hampshire. Completed plans call for site work for a water / sewer project.

Questions: Neal Campbell at CDM Smith 603-222-8332 or campbellnw@cdmsmith.com Completion time for the project will be calculated as calendar days from the date specified in the Notice to Proceed as follows: 400 calendar days for substantial completion. 500 calendar days for final completion Liquidated damages will be in the amount of $2,500, for each calendar day of delay from the date established for substantial completion, and $2,500 for each calendar day of delay from the date established for final completion. Questions should be directed to Neal Campbell at (603) 222-8332. The City of Manchester is seeking prequalification statements from construction contractors for a sewer rehabilitation and pipeline construction project that is scheduled to begin construction in spring 2021. The CMOM Program - Phase III, Sewer Rehabilitation and Repair Project - Contract 4 includes, but is not limited to, the following major elements of work: 1,665 LF of full length sewer replacements (12 to 24 diameter), 49,890 LF of full length CIPP liner (8 to 30 diameter), 471 LF excavated point repairs at 18 locations (8 to 15 diameter), 1,090 LF of internal spot repairs with CIPP liner at 118 locations (8 to 24 diameter) and manhole work (add 16 new sewer manholes and raise 7 existing frames/covers). Only prequalified firms will be allowed to bid on this project Construction contractors with extensive experience in CIPP construction projects of a similar size and scope are invited to submit prequalification statements for bidding on the City of Manchester's CMOM Program - Phase III, Sewer Rehabilitation and Repair Project - Contract 4 Each General Bid shall be accompanied by a Bid Security in the amount of 5% of the Total Bid Price. The successful Bidder must furnish 100% Performance and Payment Bonds and will be required to execute the Contract Agreement within 10 days following notification of the acceptance of his Bid. The right is reserved to waive any informalities in or reject any or all prequalifying Contractors and to accept prequalified Contractors that are deemed most favorable to the interest of the City of Manchester.

Award

Water / Sewer

$4,380,380.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
445
Active Projects
195
Bidding Soon
3,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2021

May 3, 2021

Project location map

Multiple Locations, Manchester, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.