BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Kansas City, Missouri. Completed plans call for site work for a transportation facility.

The City of Kansas City, Missouri (KCMO) is seeking proposals from qualified firms to perform Resident Engineering and Construction Administration Services for the Kansas City Streetcar project. The City reserves the right to change or extend the submission date and time for any reason. If you are requiring contractor to obtain a performance bond use the following section. Obtain Bond Forms from Contract Central by answering the question asking which bond you would like to use. A performance bond costs the City approximately 2% of the contract cost. Consult the Risk Manager if you need help in determining whether to require one. Forward all questions in writing to the following Project Manager and Contract Administrator. Questions received less than seven (7) days prior to the Submittal Date may not be answered. Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda to all Proposers. Oral or other interpretations or clarifications shall be without legal effect, even if made at a Pre-Proposal Meeting. Mark Montgomery, Project Manager Public Works Department 4721 Coal Mine Road Kansas City, MO, 64130 (816) 513-2761 (816) 513-2760 E-mail: Mark.montgomery@kcmo.org Darrell Everette, CPSM Procurement Manager Procurement Services, General Services Department 414 East 12th Street, City Hall 1 st Floor, Rm 102W Kansas City, MO 64106 (816) 513-0798 Phone (816) 513-2812 Fax Email: Darrell.everette@kcmo.org. The Federal Transit Administration (FTA) and City of Kansas City, Missouri desires that Disadvantaged Business Enterprises have a maximum opportunity to participate in the performance of City contracts. The goals for this specific project are 20.07 % DBE participation. You must complete HRD 13 Affidavit of Intended Utilization and return it with your Proposal. If you request it, the Human Relations Specialist will provide a DBE Directory and assistance. Please call the Human Relations Specialist at 816-513-1818. The City reserves the right to reject any and all proposals. As of February 3, 2022, this project is currently under construction with completion date of 2024. However, the firm timelines was not disclosed.

Under Construction

Transportation Terminals

$9,967,040.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
49
Bidding Soon
727
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2021

img_map_placeholder

Multiple Locations, Kansas City, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.