BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Village of Wellington, Florida. Completed plans call for site work for a bridge / tunnel.

As of 4/7/2021 project was already awarded for $348,470.60. The Village of Wellington Council is accepting sealed bids for ITB #202109 Wellington Trace/C-3 Canal Culvert Replacement Project. Bids must be accompanied by a Bid Bond/Security in the amount of ten percent (10%) of the Bid and must accompany each Bid in accord with the Instructions to Bidders. No bid may be withdrawn for a period of 120 days after the posting of the recommended award or as otherwise provided in Instructions to Bidders. The successful Bidder, who is awarded the contract, may be required to furnish a 100% Construction Performance Bond and a 100% Construction Payment Bond meeting the requirements of Section 255.05 Florida Statutes. The Owner reserves the right to accept or reject any or all Bids (in whole or in part) with or without cause, to waive technicalities, irregularities or informalities, or to accept bids which in its judgment best serve the Owner. Any and all questions regarding this solicitation shall be directed to the Wellington Purchasing Division: Attn: Maria Miserendino, 12300 Forest Hill Boulevard, Wellington, Florida 33414: Ph 561-791-4154 or email: mmiserendino@wellingtonfl.gov The time of commencement of the Work shall be the date stated in the Notice to Proceed (Date of Commencement). Contractor shall reach Substantial Completion of all Work within seventy-five (75) days from the Date of Commencement, subject to any authorized extensions of time as set forth in this Agreement. All Work shall be performed in an expeditious manner. Contractor shall reach Final Completion of all Work within fifteen (15) days of Substantial Completion The Contractor will provide all materials, supervision, light, power, transportation, labor, tools and equipment necessary to complete the work in strict accordance with the Contract Documents, and perform all work that is reasonably inferable therefrom as being necessary to accomplish the intent of the Contract Documents, and as required by the Manufacturers specifications and all applicable laws, ordinances and rules and regulations of any governing authority including but not limited to the requirements of the Florida Building Code and any amendments thereto. The work to be performed shall hereinafter be referred to as the Work.

Award

Bridges / Tunnels

$348,471.00

Public - City

Site Work

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
58
Bidding Soon
1,163
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2021

March 25, 2021

img_map_placeholder

Multiple Locations, Village of Wellington, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.