BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving, remodeling, renovation and addition to a mixed-use development in Fort Atkinson, Wisconsin. Completed plans call for the demolition of a educational facility; for the remodel of a educational facility; for site work for a educational facility; for paving for a sidewalk / parking lot; sidewalk / parking lot; for the addition of a 4,700-square-foot laboratory facility; for the renovation of a 3,600-square-foot laboratory facility; laboratory facility; laboratory facility; educational facility; and laboratory facility.

Project scope includes an addition of approx 4,700 sqft to the existing Madison College Fort Atkinson building to house an expanded metal fabrication lab. Renovations include approx 3,600 sqft and consist of new welding stations in the existing fabrication lab 114B, the renovation of existing shop 140 for a new computer classroom and metallurgy testing lab, and mechanical room renovations on the existing mezzanine. The addition will be similar construction to existing comprised primarily of masonry veneer cavity walls over concrete masonry units and metal stud infill walls set into a steel building frame with steel bar joist roof structure. Floors are concrete slab on grade with perimeter in-floor radiant heating. Roof is flat steel frame structure with tapered insulation system and TPO membrane roofing. Plumbing, Fire Suppression, HVAC and Electrical systems for the new addition and renovated areas, including a new air handler, make-up air unit, compressed air system, and new boilers to serve the entire facility. The work includes welding equipment, welding exhaust and filtration system, sheet steel storage units, steel storage racks, and an overhead crane in the new fabrication lab. The project will also include exterior work for new walkways, dumpster enclosure, landscaping, stormwater utilities, and parking lot improvements under the base bid scope of work. The building addition and remodeling spaces will be constructed to meet LEED Silver design guidelines. SCHEDULE: Building Addition: 3/8/2021 Renovation: Mid-May - 8/17/2021 Date of Commencement of the Work: Upon receipt of notice-to-proceed from Owner March 2021

Award

Laboratories

$2,533,361.00

Public - State/Provincial

Addition, Demolition, LEED Certification, Paving, Remodeling, Renovation, Site Work

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
216
Bidding Soon
2,948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2021

March 8, 2021

Project location map

827 Banker Rd, Fort Atkinson, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.