EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2024 at 8:00 PM

Updated April 28, 2024

Site work for a road / highway in Gilford, New Hampshire. Completed plans call for site work for a road / highway.

County : Belknap, Carroll, Cheshire, Coos, Grafton, Hillsborough, Merrimack, Rockingham, Strafford, Sullivan Scope of Work: Eastern TPK Statewide ITS R&R Location: Eastern TPK Statewide Proposal Guarantee: 5% of bid amount This Project Consists of the Removal and Replacement of Four (4) Dynamic Message Signs (Dms): Nh 101 Eb at Mm 130.0 in Hampton, Spaulding Turnpike Nb at Mm 1.0 in Portsmouth, Spaulding Turnpike Sb at Mm 7.7 in Dover and Blue Star Turnpike I-95 at Mm 0.4 in Seabrook. Unskilled labor may be hired from lists prepared by the NH Department of Employment Security designated in the proposal. Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to Charles Blackman at Charles.e.blackman@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. All individuals, firms, partnerships or corporations intending to bid, must file a statement showing their qualifications with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids. No authorization to bid will be granted to a prospective bidder not prequalified. If contract price is $35,000 or more, the successful bidder will be required to furnish electronically, at the time of approval, a contract bond in the amount of one hundred (100) percent of their bid. Project completion date is 9/26/2025 The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Removal and Replacement of 4 Dynamic Message Signs BIDDERS SHOULD ACT PROMPTLY AND SUBMIT ALL QUESTIONS PERTAINING TO THE PROJECT IN WRITING TO CHARLES BLACKMAN AT Charles.E.Blackman@dot.nh.gov AT LEAST FIVE (5) BUSINESS DAYS BEFORE THE HOUR AND DATE SET FOR THE BID OPENING. NO PHONE CALLS OR FAXES WILL BE ACCEPTED.

Award

Roads / Highways

$1,053,305.00

Public - State/Provincial

Site Work

30

6

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Design Data, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
62
Bidding Soon
1,185
All Active Projects
509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

img_map_placeholder

Multiple Locations, Gilford, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.