Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Paving for a road / highway in Nashville, Tennessee. Completed plans call for paving for a road / highway.
This project is Phase 2 of the site development of Century Farms that involves the construction of connector roads (Cane Ridge Parkway, William Turner Parkway and Century Farms Parkway) within the development site. Phase 1 involved the widening of Old Franklin Road from I-24 to Cane Ridge Road in addition to a portion of Cane Ridge Parkway built to provide access to the CHS Office Building within the site from Old Franklin Road. It was open to traffic in October 2019. The Tennessee Department of Transportation (TDOT) is continuing the modification of the Hickory Hollow Interchange that will connect I-24 with Century Farms and Cane Ridge Road. The anticipated completion time is late Summer 2021. Construction phase Developer: Century Farms, LLC Contractor: Jones Brothers Construction started: August 24, 2018 Construction and CEI cost: $25,482,750.70 (Metro is sharing a portion of the cost of construction and construction engineering and inspection work with the developer, Century Farms, LLC) Width of travel lanes: 12 foot on William Turner Parkway, Cane Ridge Parkway and Century Farms Parkway; 11.5 foot on a section of Century Farms Parkway; 16 foot on a section of William Turner Parkway. All roads will have curb and gutter and closed storm drains. Estimated completion date: February 2022 This project is included in the Nashville Department of Transportation Capital Project. As of February 10, 2022, this project is currently under construction with completion date of February 2022; however, the firm date has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Occupancy
Roads / Highways
$25,482,750.00
Public - County
Paving
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2018
Cane Ridge Rd, Nashville, TN
Related To This Project
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.