BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Arden Hills, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 19,2021, C&L Excavating is the awarded contractor for the amount of $2,704,412.10. The anticipated start date is June 14, 2021. Said proposals are for the furnishing of all equipment, labor and materials for the construction, complete in-place, of the following approximate quantities and other quantities specified in the Proposal Form: Quantity Unit Item 13,400 CU YD Common Excavation 24,500 SQ YD Full Depth Reclamation 6,000 TON Bituminous Street Paving 7,500 TON Aggregate Base Class 5 6,000 CU YD Select Granular Borrow 1,500 LIN FT CIPP Sewer Lining 900 LIN FT Pipe Bursting Forcemain 3,700 LIN FT Watermain 2,800 LIN FT Storm Sewer 10,000 LIN FT Concrete Curb & Gutter 1,200 SQ YD Concrete Driveway Pavement 2,400 SQ FT Bituminous Walk 9,000 SQ YD Turf Restoration Bids must be submitted on the Proposal Forms provided in accordance with the Contract Documents, Plans, and Specifications, which are on file with the City Engineer of Arden Hills and may be seen at City Hall, 1245 West Highway 96, Arden Hills, MN 55112. Bids will only be accepted from Contractors who purchase digital or paper bidding documents as specified above. The provisions of Minn. Stat. 16C.285 Responsible Contractor are imposed as a requirement of this contract. No bid will be considered unless sealed and filed with the City Clerk of Arden Hills before the stated bid time and accompanied by a bid bond, cashier's check, or certified check made payable without recourse to the City of Arden Hills in an amount equal to five percent (5%) of the amount bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder fails to enter promptly into a written contract and furnish the required bonds. A Performance Bond and a Labor and Material Payment Bond, each in the full amount of the Contract Sum, will be required of the successful bidder. No bid may be withdrawn for a period of ninety (90) calendar days after bids are opened. The Owner reserves the right to reject any or all bids and to waive irregularities and formalities in order to award the contract in the best interests of the City of Arden Hills.

Award

Roads / Highways

$2,704,412.00

Public - City

Paving, Site Work

110

15

4

5

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
83
Bidding Soon
800
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2021

June 14, 2021

img_map_placeholder

Multiple Locations, Arden Hills, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.