BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Storrs Mansfield, Connecticut. Completed plans call for site work for a water / sewer project.

During the North Eagleville Road Phase IIIB project, a new section of direct buried steam pipe was scheduled to be installed from existing vault E-5 to a section of piping that was installed under a previous project. Prior making the final connections, a pressure test was performed to determine if the existing steam lines were in serviceable condition. The existing piping failed the pressure test resulting in suspicion that there may be a breach in an outer conduit. A subsequent tracer gas test was performed on the piping system from existing vault E-5 to existing vault B-6. The results of the tracer gas test indicated potential leaks in the existing piping at several locations. To address the leaks, the NER IIIA engineer of record proposed initial repairs at specific joints. UPDC proceeded with the initial repairs through the NER IIIB construction manager and during the course of executing the initial repairs, the design and construction team determined that the condition of the steam line in question was more problematic than what they initially suspected and that more extensive research and testing was needed to make informed recommendations. After further investigation, the project engineer of record proposed immediate repairs to steam infrastructure in the area of vault B6 to alleviate issues with standing water. Scope of Work includes providing civil sitework, sanitary, and electrical scope to facilitate the installation of a new concrete steam vault dewatering pump chamber. Included in the scope is the installation of approximately 130 lf of sanitary force main which will connect to an existing sanitary manhole Liquidated Damages of Five Hundred ($500) Dollars per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion, Q&A (RFI) Due Date and Time February 10, 2021 2:00 p.m. The University reserves the right to reject any or all Bids, in whole or in part, to award any item, group of items, or total bid; and to waive any informality or technical defects; if it is deemed to be in the best interest of the University. Scope Review Meeting (with lowest qualified bidder, to be determined after Bid Opening) February 25, 2021 10:00 a.m. Project ID: UCONN VAULT B6 P.O.#: 3263-008 Phoenix ID: CH12745 File No. 3263-008.00 The construction is planned to start: March 31, 2021 Construction duration: Sixty (60) days

Post-Bid

Water / Sewer

$326,777.00

Public - State/Provincial

Site Work

60

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
263
Bidding Soon
3,650
All Active Projects
1,703
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2021

March 31, 2021

img_map_placeholder

Storrs Road,, Storrs Mansfield, CT

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.