Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a water / sewer project in San Antonio, Texas. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This project has been canceled and will not re-bid. For questions regarding this solicitation, technical questions or additional information, please contact Roxanne Lockhart, Contract Administrator, in writing via email to: Roxanne.Lockhart@saws.org or by fax to (210) 233-4438 until 5:00 PM (CT) on February 23, 2021. Answers to the questions will be posted to the web site by 4:00 PM (CT) on February 26, 2021 as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Small, Minority, and Women-owned Business Participation 10% The electrical work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment, supplies, and appurtenances; providing all construction plans, equipment and tools; performing all necessary labor and supervision, and the construction, complete including all work appurtenant thereto, at Waterwhell Booster Pump Station located in San Antonio, TX. This Summary of Work is being provided to Respondents to better assist them in determining which projects are reasonably comparable to include as part of their proposal to this RFCSP. The work consists of the following: a. Construction of upgrades to an existing SAWS pump station facility, including construction of a new control building, installation of additional pumps with corresponding site piping, electrical work, and SCADA installation. b. Careful planning and sequencing of construction activities to tie into existing facility infrastructure. Respondents should reference the Contract Documents prior to submitting a proposal for this RFCSP to fully understand the entire scope of work for this Project. The decision of "comparability" when evaluating the Respondent's proposal is at the complete discretion of SAWS. The SMWVB goal on this project is20% Questions Due Date: Sep. 20, 2021 by 2:00 PM

Project Abandoned

Water / Sewer

$2,800,000.00

Public - City

New Construction, Site Work

65

28

12

7

Subscribe For Documents

144 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
101
Bidding Soon
2,445
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2021

March 18, 2023

Project location map

15115 Culebra Rd, San Antonio, TX


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed