BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Manito, Illinois. Completed plans call for the renovation of a educational facility.

**As of March 02,2021, this project has not yet been awarded. They might award the project on Thursday March 04,2021.** This project consists of a full roof restoration at the Midwest Central CUSD #191 Primary School. Bid security shall be submitted with each bid in the amount of five (5) percent of the bid amount. No bids may be with-drawn for a period of 30 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities All correspondence including but not limited to, questions shall be directed to the office of the Architect, Farnsworth Group, Inc., Attention: Aaron M. Neal, AIA, NCARB; Email: aneal@f-w.com; Telephone: 309.663.8436 Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. The Owner requires all contractors and vendors doing business with the Owner not to discriminate against anyone on the basis of race, age, color, religion, gender, sexual orientation, ancestry, non-job-related handicaps or national origin Midwest Central CUSD No. 191 reserves the right to accept or reject any and all bids, and to waive any and all informalities in the bidding. After receipt of bids and completion of the review process, Midwest Central CUSD No. 191 may award a contract to the bidder that, in its opinion, will provide a combination of the best services and reasonable cost. Successful bidders shall be required to observe the fair employment practices commission rules pertaining to equal employment opportunity, and comply with the Illinois Prevailing Wage Act, 820 ILCS 130/1 et seq.., and use wage determination as determined by the Illinois Department of Labor, Conciliation, and Mediation Division dated current to the bid date. These wages will remain in effect until superseded by a new determination. Bids will be held good for a period of thirty (30) days subsequent to the opening of bids

Post-Bid

Educational

$500,000.00

Public - County

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
24
Bidding Soon
412
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2021

March 18, 2021

img_map_placeholder

450 Southmoor Ave, Manito, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.