EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Atlantic City, New Jersey. Completed plans call for the renovation of a educational facility.

Bids must be accompanied by a certified check, bank cashier's check, treasurer's check or Bid Bond, with corporate surety satisfactory to the Owner, in an amount not less than 10% of the Base Bid (but in no case in excess of $20,000.00, pursuant to N.J.S.A 18A:18A-24), naming as payee or obligee, as applicable, Atlantic City Board of Education, to be retained and applied by the undersigned as provided in Contract Documents in case bidder would default in executing the Agreement or furnishing the required bonds and insurance certificates as required by Contract Documents. Prospective bidders are advised that this Project is one which will be subject and will be governed by provisions of New Jersey State Law governing (a) Prequalification of Bidders N.J.S.A. 18A:18A-26 et seq., (b) Prevailing Wage Rates N.J.S.A. 34:11-56.27, (c) Use of Domestic Materials, N.J.S.A. 1 to 52:34-4 including any amendments and supplements thereto, and (d) P.L. 1977, Chapter 33, (N.J.S.A. 54:25-24-2) listing corporate/ partnership names and addresses for individuals with a share of 10% or more. "The Public Works Contractor Registration Act" became effective on April 11, 2000. No contractor shall bid unless the contractor is registered pursuant to this act. Pursuant to C57, Laws of 2004 (s1778) all business organizations that do business with a local contracting agency are required to be registered with the State and provide proof of their Registration with the New Jersey Department of Treasury, Division of Revenue before the contracting agency may enter into a contract with the business. All bidders shall adhere to the information as classified as "New Jersey Business Registration Requirements". In addition, and pursuant to N.J.S.A. 18A:18A-25, each bid must be accompanied by a certificate from a surety company stating it will provide said bidder with a bond in such sum as required by the above referenced statute. No proposals may be withdrawn for a period of 60 days after the date set for opening of bids. Right is reserved to waive informalities and to accept any bid or to reject any and all bids. Bidders must comply with the requirements of P.L. 1975, Chapter 127, NJAC 17:27 Laws Against Discrimination and NJSA 10:5-31 et seq.

Award

Educational

$240,600.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Flashing and Sheet Metal, Flexible Flashing, Roof and Wall Specialties and Accessories, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Hardware
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Identification for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Central Heating Equipment, Heat Exchangers for HVAC, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
88
Bidding Soon
1,554
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2021

June 8, 2021

img_map_placeholder

1400 N Albany Ave, Atlantic City, NJ

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

ACHS Dehumidifier

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.