BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2021 at 8:00 PM

Updated May 28, 2024

Demolition, site work, renovation and addition to a detention facility in Milton Station, Prince Edward Island. Completed plans call for the addition of a 22,723-square-foot, one-story above grade detention facility; for the renovation of a 32,065-square-foot detention facility; and 9,666-square-foot detention facility.

Contract #2 - Building Scope of Work includes: All work in the construction of the new Provincial Correctional Centre addition as defined within the Contract #2 - Building documentation including integration into the Contract #1 - Foundation & Site Works as found works. The following sub-trades are to be bid directly to the General Contractors through the Bid Depository of the Construction Association of PEI: Mechanical; Electrical; Fire Protection. The closing date for the above sub-trades is 2:00 p.m. on Friday, February 12, 2021 at the Construction Association of PEI. Contact: Ross MacIntosh: Tel 902-394-4523; Fax 902-569-0590 Tender documents are available electronically at: http://www.princeedwardisland.ca/en/tenders . At this time hard (paper) copies of tender documents will not be made available to bidders. Direct all inquiries during the tender period to: Nick White, Phone: (902) 368-2300 Email: nwhite@colesassociates.com CC: tellsworth@colesassciates.com

Award

Jails / Prisons

$13,646,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

159

34

17

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
6
Bidding Soon
343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2021

April 5, 2021

Project location map

508 Sleepy Hollow Rd, Milton Station, PE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.