BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2021 at 8:00 PM

Updated January 25, 2024

Site work for a service station / car wash facility in Fargo, North Dakota. Completed plans call for site work for a service station / car wash facility.

Bids shall be upon cash payment to supply, install, operate and maintain a 62.5kW Dual Cord DC Charging Station to be located at City Hall, 225 4th Street North. Work is anticipated to include, but is not limited to, low voltage wiring, grounding and bonding, conduit and boxes, panelboards, wiring devices, surge protective devices, electric vehicle charging equipment, excavation/trenching, and concrete pads.

Award

Service Station / Car Wash

$98,548.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
21
Bidding Soon
243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2021

March 19, 2021

Project location map

225 4th St N, Fargo, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.