BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a detention facility in Saint Paul, Minnesota. Completed plans call for the construction of a detention facility; and for site work for a detention facility.

Work under this Contract includes: Interior Finishes, Patching of insulated gypsum board/metal stud partitions. Wall finishes of paint where necessary to complete patching. Mechanical Systems, Ventilation to include, fan coils, chilled water piping, DX condensers, chillers, cooling towers. Temperature control system, Electrical Systems, Electrical connections to mechanical equipment. Lay out Work from the reference points furnished and be responsible for all lines, elevations, and measurements inside workspace. Exercise proper precaution to verify figures shown on Drawings before laying out work and will be held responsible for any error resulting from his failure to exercise such precaution.Hire the services of a locator company to locate all privately owned utilities that may be disturbed by construction operations. Owner reserves the right to place and install equipment in completed areas of building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. Maintain access, building utilities, and services to allow full and free use of the facility during this time. All temporary conditions, re-routing of services, utilities and/or power are the Contractor's responsibility.Coordinate access and storage of materials and equipment with the Owner's designated building representative. To the fullest extent possible provide for normal building operation, and the safety of the building's occupants. Work in areas that occur during evenings and weekends shall be cleaned and available for use the following business day Provide a cost to furnish and install the three (3) additional Fan Coil Units as outlined on the Contract Documents, including, but no limited to, all mechanical, electrical, controls, and general construction provisions for a fully functional system.Schedule within 15 days after date of Notice to Proceed. The method of contractor selection has not been determined at this time.

Post-Bid

Jails / Prisons

$600,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
803
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2021

May 10, 2021

img_map_placeholder

25 7th St W, Saint Paul, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.