BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 31, 2021 at 8:00 PM

Updated March 14, 2025

Site work for a water / sewer project in New Braunfels, Texas. Completed plans call for site work for a water / sewer project.

**Project was awarded to D Guerra Construction LLC in the amount of $6,898,802.50. NBU Anticipates The Following Items Will Be Included In The Scope Of Work For The Project: Construction Of Approximately 5,200 LF Of 24-inch Water Mainincluding Trenching/backfill,trench Safety, Jacking/boring, Fittings, Valves, Connections,and Other Appurtenances;construction Of Approximately 6,350 LF Of 8-inch Through 12-inch Water Main Including Trenching/backfill,trench Safety,jacking/boring,fittings,valves,connections,and Other Appurtenances;construction Of Approximately 4,900 LF Of 8-inch And 16-inch Gravity Sanitary Sewer Main Including Trenching/backfill,trench Safety, Manholes,connections,and Other Appurtenances;preparation Of Right-of-way Including Clearing/grubbing And Construction Staking; Storm Water Pollution Prevention;groundwater Control;traffic Control;site Restoration; And All Other Appurtenances Necessary To Complete The Project.The Project Will Be Designed And Constructed So As To Meet All Applicable Federal,state,and Local Accessibility Standards. The Selected Offeror Will Be Also Responsible For Obtaining All Applicable Permits And Inspections; Providing All Necessary Performance And Payment Bonds And Insurance Requirements; And Providing Owner With All Manufacturers Warranties And All Operations And Maintenance (O & M) Manuals For All Equipment Installed. NBU Has Established A Target Commencement Date For Construction Activities As May 15, 2021.The Work Shall Be Substantially Complete Within Five Hundred Fifty (550) Calendar Days From The Notice To Proceed Date And Ready For Final Payment In Accordance With Paragraph 14.07 Of The General Conditions. NBU Reserves The Right To Phase The Construction Of The Project Or Modify The Schedule As Needed And Determined By The NBU Board Or Staff Due To Modifications In Scope. Receipt Of Response Does Not Bind New Braunfels Utilities To Any Contract For Said Services,nor Does It Give Any Guarantee That A Contract For The Project Will Be Awarded. Each Bid Must Be Accompanied By An Approved Bid Bond In The Amount Of 5% Of The Bid Cost, Payable To The New Braunfels Utilities Without Recourse,as A Guarantee Bidder Will Enter Into A Contract At The Stated Price.The Successful Bidder Must Execute 100% Performance And Payment Bonds On The Forms Provided, Within Ten (10) Days After The Contract Has Been Awarded. Questions Regarding This RFB Or The Services Requested Must Be Sent To The Manager Of Purchasing Purchasing@nbutexas.combefore February 15 2021,at 4:00 P.M.Any Changes,additions,or Clarifications To The RFB Are Made By Amendments (addenda) And Will Be Posted On Electronically. Bids Shall Remain Open And May Be Held By New Braunfels Utilities For Ninety (90) Days For Full Evaluation And Ranking Of Offerors. Based On Its Sole Discretion, NBU Reserves The Right To Determine The Propriety Of Any Bid And May Disqualify Any Bidder Based On An Incomplete, Inaccurate, Or Noncompliant Bid.The Board Of Trustees Of New Braunfels Utilities Reserves The Right To Reject Any Or All Of The Bids, To Waive Formalities,and To Make An Award To An Offeror As Outlined In This RFB.Bidders Will Be Notified In Writing Of Any Determinations Made By NBU Or Its Board Of Trustees Pursuant To This Section

Under Construction

Water / Sewer

$6,898,803.00

Public - City

Site Work

129

1

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
138
Bidding Soon
2,542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2021

May 15, 2021

Project location map

S Castell Ave, New Braunfels, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.