Published March 6, 2021 at 7:00 PM
Updated November 15, 2023
Site work and paving for a mixed-use development in Tipton, Iowa. Completed plans call for site work for a road / highway; for paving for a sidewalk / parking lot; and water / sewer project.
General Nature of Improvement. The work generally consists of the following: Excavation, Class 10, Class 12, or Class 13 - 1,140 CY; Subgrade Preparation - 4,450 SY; Trench Compaction Testing - Lump Sum; Storm Sewer Service Stub, PVC, 4" - 12 LF; Water Main, Trenched, C900 PVC, 8" - 1,485 LF; Water Service Stub, Trenched, Type K Copper, 1" - 50 LF; Water Service Stub, Trenchless, Type K Copper, 1" - 550 LF; Water Service Corporation, 1" - 15 EA; Water Service Curb Stop and Box, 1" - 15 EA; Water Main Connection - Connection 1 - Lump Sum; Water Main Connection - Connection 2 - Lump Sum; Water Main Connection - Connection 3 - Lump Sum; Water Main Connection - Connection 4 - Lump Sum; Water Main Connection - Connection 5 - Lump Sum; Valve, Gate, 8" - 5 EA; Fire Hydrant Assembly - 2 EA; Fire Hydrant Assembly Removal - 2 EA; Sampling Station - Lump Sum; Manhole Adjustment, Minor - 4 EA; Pavement, PCC, 7" Thick - 122 SY; Curb and Gutter, 30" Wide, 6" Thick - 485 LF; PCC Pavement Samples and Testing - Lump Sum; Granular Surfacing, Class A Crushed Stone - 20 TON; Pavement, HMA - 1,075 TON; HMA Pavement Samples and Testing - Lump Sum ; Removal of Sidewalk - 13 SY; Removal of Driveway - 358 SY; Sidewalk, PCC, 4" Thick - 9 SY; Driveway, Paved, PCC, 6" Thick - 436 SY; Milling - 4,115 SY; Pavement Removal - 165 SY; Curb and Gutter Removal - 883 LF; Temporary Traffic Control - Lump Sum; Hydraulic Seeding, Fertilizing, and Mulching - Lump Sum; and Mobilization - Lump Sum.
Bid Results
Roads / Highways
$399,085.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2021
June 7, 2021
Mulberry St, Tipton, IA
Related To This Project
Tipton, IA
Bid Date: Mar 31 2020
Tipton, IA
Bid Date: Jan 19 2022
Tipton, IA
Bid Date: Oct 17 2023
Tipton, IA
Bid Date: Oct 17 2023
Tipton, IA
Bid Date: Dec 20 2023
Tipton, IA
Bid Date: Dec 21 2023
Tipton, IA
Bid Date: Jan 17 2024
Tipton, IA
Bid Date: Jan 17 2024
Tipton, IA
Bid Date: Feb 24 2022
Tipton, IA
Bid Date: Nov 16 2021
Tipton, IA
Bid Date: Apr 17 2024
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Feb 29 2024
Tipton, IA
Bid Date: Feb 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.