BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2024 at 7:00 PM

Updated March 5, 2024

Site work and paving for a civil project in Tipton, Iowa. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Excavation, Class 10 - 1,561 CY; Subgrade Preparation (12" Thick) - 3,455 SY; Subbase, Modified, 6" Thick - 3,455 SY; Compaction Testing - Lump Sum; Trench Foundation - 50 TON; Trench Compaction Testing - Lump Sum; Storm Sewer, Trenched, PVC, 4" - 30 LF; Storm Sewer, Trenched, 12" - 166 LF; Storm Sewer, Trenched, RCP, 12" - 53 LF; Storm Sewer, Trenched, 15" - 150 LF; Storm Sewer, Trenched, RCP, 15" - 53 LF; Storm Sewer, Trenched, 18" - 372 LF; Removal of Storm Sewer, All Types, <15" - 474 LF; Pipe Apron, Metal or RCP, 12" - 4 EA; Subdrain, Type 1 (Longitudinal Subdrain), 4" Dia. - 1,670 LF; Subdrain Outlets and Connections, CMP or PVC, 4" or 6" - 8 EA; Lower/Relocate Existing Water Service - 5 EA; Intake, SW-501 - 1 EA; Intake, SW-502, 48" Dia. - 2 EA; Intake, SW-503 - 1 EA; Intake, SW-505 - 1 EA; Intake, SW-506 - 1 EA; Intake, SW-512, Case 1, 24" Riser - 5 EA; Manhole Adjustment, Minor - 2 EA; Connection to Existing Intake - 1 EA; Modify Existing Intake - Lump Sum; Pavement, PCC, 7" Thick, C3 or C4 (with Baskets) - 3,058 SY; PCC Pavement Samples and Testing - Lump Sum; Removal of Driveway - 257 SY; Driveway, Paved, PCC, 6" Thick - 337 SY; Driveway, Granular - 45 TON; Pavement Removal - 2,106 SY; Temporary Granular Surfacing - 130 TON; Temporary Traffic Control - Lump Sum; Seeding, Fertilizing, and Mulching - Lump Sum; Warranty - Lump Sum; SWPPP Preparation - Lump Sum; SWPPP Management - Lump Sum; Rip Rap, Class D - 25 TON; Silt Fence or Silt Fence Ditch Check - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Sediment - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Device - 250 LF; and Mobilization - Lump Sum. Est. Value - $ 584,456.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the City, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Tipton on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Seven Hundred Fifty Dollars ($750.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The contract shall be fully completed and ready for final payment within 70 working days from written Notice to Proceed. The Notice to Proceed will be issued on or about June 1, 2024. The City of Tipton reserves the right to reject any and all bids.

Bid Results

Water / Sewer

$454,808.00

Public - City

Paving, Site Work

16

9

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
89
Bidding Soon
1,085
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

June 1, 2024

Project location map

Plum St, Tipton, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.