BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a transportation facility in Scottsbluff, Nebraska. Completed plans call for site work for a transportation facility.

The right is reserved, as the Airport Authority of the County of Scotts Bluff may require, to reject any and all bids and to waive any informality in the bids received. This project is subject to the requirements of the Davis-Bacon Act, as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the to-tal amount of the bid. The bid guaranty may be by certified check or bid bond made payable to the Airport Authority of the County of Scotts Bluff. Bids may be held by the Airport Authority of the County of Scotts Bluff for a period not to exceed 120 Calendar Days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The Airport Authority of the County of Scotts Bluff, in accordance with the provisions of Title VI of Notice of Non-segregated Facilities Requirement: Notice to Prospective Federally Assisted Con-struction Contractors 1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a federally-assisted construction contract exceeding $10,000 which is not exempt from the provisions of the Equal Opportunity Clause. 2. Contractors receiving federally-assisted construction contract awards exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of the following notice to prospective subcontrac tors for supplies and construction contracts where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity Clause. 3. The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Notice to Prospective Subcontractors of Requirements for Certification of Non-Segregated Facili-ties: 1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a subcontract exceeding $10,000, which is not exempt from the provisions of the Equal Op portunity Clause. 2. Contractors receiving subcontract awards exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the for warding of this notice to prospective subcontractors for supplies and construction con tracts where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity Clause. 3. The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Certification of Non-segregated Facilities: The federally-assisted construction contractor certifies that she or he does not maintain or pro-vide, for his employees, any segregated facilities at any of his establishments and that she or he does not permit his employees to perform their services at any location, under his control, where segregated .

Award

Transportation Terminals

$4,098,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

May 10, 2021

Project location map

To Be Determined, Scottsbluff, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.