Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 6, 2021 at 8:00 PM
Updated July 18, 2025
Renovation of a clubhouse / community center in Orlando, Florida. Completed plans call for the renovation of a clubhouse / community center.
**As of April 6, 2021 this project has not yet been awarded. Anticipated award date is on April 12, 2021. The project will consist of Work includes installing, electrically interconnecting and commissioning an angled, ballasted photovoltaic system, on the existing Dover Shores Community Center roof. Work also includes removing the metal deck and parapet at the metal canopy, prepping, painting and sealing the existing structure to accept a flat, racked photovoltaic system. The work will also include connecting the photovoltaic (PV) system's inverters and validating they properly integrate with the facility`s Automated Logic Corporation (ALC) LGR web-controls and LUCID platform to insure the PV system properly communicates its production data with the building automation system (BAS). Question End Date 2/26/2021 5:00 PM Anticipated Award Date 4/12/2021 Bid Bond Amount 10%
Post-Bid
Clubhouse / Community Centers
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2021
April 9, 2021
1400 Gaston Foster Rd, Orlando, FL
Related To This Project
Orlando, FL
--
Orlando, FL
Bid Date: Aug 19 2025
Orlando, FL
Bid Date: Aug 06 2025
Orlando, FL
--
Orlando, FL
Bid Date: Oct 06 2025
Orlando, FL
Bid Date: Aug 19 2025
Orlando, FL
Bid Date: Jul 17 2025
Orlando, FL
Bid Date: Sep 02 2025
Orlando, FL
Bid Date: Aug 08 2025
Orlando, FL
Bid Date: Jul 15 2025
Orlando, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
