Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work and paving for a bridge / tunnel in Orlando, Florida. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Perform a Hydraulic Model and Profile for the entire Iron Bridge Regional Facility encompassing the Master Pump Station through all discharge points-wetlands, reclaim, Little Econ. Identify Hydraulic 'Choke Points' and develop alternatives to mitigate identified Choke Points to allow 60 mgd. Provide a Preliminary Cost Estimate to resolve the Hydraulic Choke points. Implement a project to correct identified Hydraulic choke points allowing facility to receive and process up to 60 mgd. As of July 15, 2025, this project is included in the City's 2025-2029 Capital Improvement Program (CIP)
Conceptual
Bridges / Tunnels
$325,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
