Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Pensacola, Florida. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of 4/9/2021 project was already awarded for $2,243,628.95. The length of the work zone is approximately 5170 linear feet beginning at approximately 850 east of Davis Highway and terminating at Lanier Drive. The work includes, but is not limited to, clearing of vegetation within the right of way, milling and removal of the existing asphalt, centerline realignment of a portion of the existing road, horizontal and vertical reconstruction of a portion of the existing road including subgrade and base, installation of curb and gutter the entire length of the road, installation of sidewalks along the north right of way and a portion of the south right of way, modifications to existing drainage conveyance systems including inlets, pipes, ditches and swales, installation of new drainage structures and connecting pipes, asphalt installation, road intersection reconstruction, residential and commercial driveway construction, and signage and striping. Maintenance of traffic and erosion control is required for the entire construction period. The City of Pensacola adheres to the Americans with Disabilities Act and will make reasonable accommodations for access to City services, programs and activities. Please call 435-1835 for further information. Requests must be made at least five (5) calendar days of the event in order to allow the City time to provide the requested services. The City of Pensacola reserves the right to accept or reject any or all bids, to award bids on a split-order basis by item number when applicable, to waive any bid informalities and to re-advertise for bids when deemed in the best interest of the City of Pensacola The City of Pensacola has established a Minority/Women Business Enterprise Program (MWBE). The MWBE Participation goal for this project is 5%.

Award

Sidewalks / Parking Lot

$2,243,629.00

Public - City

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
68
Bidding Soon
946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2021

April 13, 2021

Project location map

E Burgess Rd, Pensacola, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed