BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in San Jose, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Santa Clara Valley Transportation Authority ("VTA") is requesting sealed written bids from responsive and responsible qualified firms for the project "King Road at Alum Rock Ave Bus Stop Improvements". Work consists of, but is not limited to furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to excavate Portland cement concrete (PCC) pavement, sidewalk, driveway, curb, gutter, and base; excavate asphalt concrete and base; remove and salvage a trash receptacle and bench; construct a PCC sidewalk, driveway, and bus pad with monolithic curb and valley gutter; construct an asphalt pavement conform; install VTA-furnished shelter and benches; install lane striping and pre-formed thermoplastic green bike lane including bike symbols, legends and arrows. The Bidder itself, as prime contractor, must possess a Class A General Engineering license. The contract is for 90 calendar days. The estimated cost of the Project is in the range of $340,000.00 to $375,000.00. Each Bid must be accompanied by a certified check, a cashier's check or a bidder's bond in the sum of not less than 5% of the Total Bid Price. Refer to Section 3.10.2 Bid Security Form/ Bidder's Bond. NOW THEREFORE, if the aforesaid Principal shall not withdraw said Bid within 120 calendar days after said opening, and shall within the period specified therefore, or if no period be specified, within six (6) working days after the prescribed forms are presented to Principal for signature, enter into a written contract with VTA in the prescribed form in accordance with the Bid as accepted ("Contract"), submit the required insurance certificates and file two bonds with VTA; a Performance Bond in the amount of 100% of the Total Contract Price to guarantee faithful performance of the Work under the Contract and a Payment Bond in the amount of 100% of the Total Contract Price to guarantee payment for labor and materials, as required by law, or in the event of the withdrawal of said Bid within the period specified or the failure to enter into such Contract and give such bonds and insurance within the time specified, if the Principal shall pay VTA the difference between the amount specified in said Bid and the amount for which VTA may procure the required work, if the latter amount be in excess of the former, together with all costs incurred by VTA in again calling for bids, should that become necessary, then the above obligation shall be void and of no effect, otherwise to remain in full force and effect. Please direct inquiries concerning the Contract Documents, bidding procedure and legal requirements to the designated Contract Administrator for this project: Contract Administrator: Cathy Clegg Email: Cathy.Clegg@vta.org The deadline for submitting inquiries will be 2 PM, five (5) working days before Bid Opening date. Bidders may not communicate with VTA Directors, Officers, staff or consultants. All requests for clarification, objections to or questions about the structure, content or distribution of this Invitation for Bids ("IFB"), or other inquiries during the procurement process must be submitted via email to the Contract Administrator. Communicating with any VTA representative(s) about this IFB other than as specifically permitted herein is grounds for disqualification. Questions and/or objections must be as specific as possible and must identify the name of the project and the IFB section number and title at issue. Any party submitting a question or objection must be as specific as possible in their description. Biddersshall only rely on information contained in this IFB, and any subsequent written supplement issued by the VTA through VTA's bid process. Bidders shall not rely on any other written or oral statements of the VTA or its officers, directors, employees, or agents regarding the Work, including statements made during site tours or otherwise. VTA reserves the right to cancel the procurement, to reject any and all Bids, or to negotiate separately in any manner necessary to serve the best interests of VTA, in accordance with applicable law. VTA reserves the right to waive any informality or immaterial irregularity in any Bid and/or accept or reject any items of a Bid

Bid Results

Sidewalks / Parking Lot

$199,492.00

Public - County

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
70
Bidding Soon
1,486
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2021

April 15, 2021

img_map_placeholder

S King Rd, San Jose, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.