BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2021 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a water / sewer project in Brazoria, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Project scope shall include construction of a new 0.399 MGD concrete wastewater treatment plant. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. This contractshall include furnishing all labor, materials, tools, equipment and supervision necessary to construct wastewatertreatmentfacilitiesincluding fabricated steeltreatment basins, aeration blowers, submerged turbine mixers, chlorination equipment, access roadway, painting and other items as shown or indicated, complete with all necessary controls and electrical wiring and switchesforfully automatic operation. The contractshall also include grading, landscaping, seeding and fencing as indicated. All material and equipment shall be installed complete and ready for operation at the location and in the manner prescribed in these contract documents. All work and materials installed shall conform to the requirements and standards of the Texas Commission on Environmental Quality, City of Manvel, American Petroleum Institute, American Society for Testing Materials, American Welding Society, National Electric Code, American Water Works Association and any other applicable standards.

Award

Water / Sewer

$6,236,412.00

Public - County

New Construction, Site Work

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
5
Bidding Soon
1,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2021

May 10, 2021

Project location map

To Be Determined, Brazoria, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.