BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2021 at 8:00 PM

Updated January 15, 2025

Site work for a water / sewer project in Boggs Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of 4/29/2021 The project was awarded to Ameron Construction Company for $137,726.95. The Notice to Proceed has not been issued, but I expect it will be by early next week. The Contract involves the replacement of existing stormwater pipe with 18" and 24" HDPE pipe and replacement/installation of 8 inlets.Bids will be based on a unit price basis. A Pre-Bid Conference to discuss the Contract will not be held. The Work is to be substantially completed within 90 days from the specified date. This Project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. Bid security must be provided at the time of bid submission in the amount of ten percent (10%) of the total bid price made payable to Boggs Township in the form of a certified or bank check or a bid bond issued by an accepted surety and executed by the bidder. Surety companies executing bonds must be listed in the U.S. Treasury Department Circular 570, as currently amended, and be authorized to be in business in the Commonwealth of Pennsylvania. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by the required Performance and Payment Bonds. The Performance and Payment Bonds shall be in the amount of 100% of the liability of the Contract. Inquiries related to this solicitation shall be submitted via electronically. CLARIFICATION DEADLINE 2/24/2021 12:00 PM CONSTRUCTION TO BEGIN NO EARLIER THAN JUNE 15, 2021. Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions. The Work is to be completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 15 calendar days from the date when the Work is determined to be substantially complete. A. The OWNER will award a contract which will commence in accordance with the General Conditions. Under this contract, you, the CONTRACTOR will: 1. Install approximately 800 LF of 18 and 24 HDPE storm water pipe, along with replacing 8 standard inlets and restoration. B. This general outline does not in any way limit the responsibility of the CONTRACTOR to perform all work and furnish the required materials, equipment and labor as shown or required by the contract documents. C. Provide completely and in full all materials, equipment, and labor obviously a part of the work and necessary for the proper operation and installation of same, although not specifically indicated in the contract documents, as if called for in detail, without additional cost to the OWNER.

Award

Water / Sewer

$137,727.00

Public - City

Site Work

14

8

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
84
Bidding Soon
1,040
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

May 3, 2021

Project location map

2nd Ave, Boggs Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.