Published April 29, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Boggs Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of 4/29/2021 The project was awarded to Ameron Construction Company for $137,726.95. The Notice to Proceed has not been issued, but I expect it will be by early next week. The Contract involves the replacement of existing stormwater pipe with 18" and 24" HDPE pipe and replacement/installation of 8 inlets.Bids will be based on a unit price basis. A Pre-Bid Conference to discuss the Contract will not be held. The Work is to be substantially completed within 90 days from the specified date. This Project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. Bid security must be provided at the time of bid submission in the amount of ten percent (10%) of the total bid price made payable to Boggs Township in the form of a certified or bank check or a bid bond issued by an accepted surety and executed by the bidder. Surety companies executing bonds must be listed in the U.S. Treasury Department Circular 570, as currently amended, and be authorized to be in business in the Commonwealth of Pennsylvania. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by the required Performance and Payment Bonds. The Performance and Payment Bonds shall be in the amount of 100% of the liability of the Contract. Inquiries related to this solicitation shall be submitted via electronically. CLARIFICATION DEADLINE 2/24/2021 12:00 PM CONSTRUCTION TO BEGIN NO EARLIER THAN JUNE 15, 2021. Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions. The Work is to be completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 15 calendar days from the date when the Work is determined to be substantially complete. A. The OWNER will award a contract which will commence in accordance with the General Conditions. Under this contract, you, the CONTRACTOR will: 1. Install approximately 800 LF of 18 and 24 HDPE storm water pipe, along with replacing 8 standard inlets and restoration. B. This general outline does not in any way limit the responsibility of the CONTRACTOR to perform all work and furnish the required materials, equipment and labor as shown or required by the contract documents. C. Provide completely and in full all materials, equipment, and labor obviously a part of the work and necessary for the proper operation and installation of same, although not specifically indicated in the contract documents, as if called for in detail, without additional cost to the OWNER.

Award

Water / Sewer

$137,727.00

Public - City

Site Work

14

8

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
51
Bidding Soon
517
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

May 3, 2021

img_map_placeholder

2nd Ave, Boggs Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Second Avenue Stormwater Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.