Published March 6, 2021 at 7:00 PM

Updated July 9, 2025

Demolition, site work and asbestos abatement for an educational facility in Dallas, Texas. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

**2/16/2021: DUE TO EXTREME WEATHER CONDITIONS WE ARE UNABLE TO UPLOAD ALL RFP DOCUMENTS AT THIS TIME. REMAINING RFP DOCUMENTS WILL BE UPLOADED IN THE COMING DAYS. ALL DRAWINGS AND SPECIFICATIONS ARE AVAILABLE** This Bid Package is for Phase 2 of 4 Dallas Independent School District. The overall project scope of work consists of converting the existing tornado damaged 50,000 sq. ft. Walnut Hill Elementary School into a 167,000 sq. ft. high school career institute. The building will serve multiple career pathways including construction carpentry, Mechanical HVAC, Plumbing. Electrical, aviation, automotive, interior design, and more. Phase 2 Civil & Grading (Anticipated Construct on June 2021 through July 2022): Current Bid Package 1) Below grade demolition of existing utilities 2) Demolition of landscaping, site perimeter fence, site concrete and paving 3) SWPPP services 4) Grading for new foundations and site improvements 5) New utilities and temporary services 6) Offsite improvements 7) Site Paving and sidewalks 1) Concrete foundations 2) Under slab electrical, plumbing, and fire protection 3) Structural steel and roof decking supply and erection 4) Supplements and replacements at existing wood structural elements 5) ICF Structure at storm shelter 6) Temporary services 1) New exterior wall and roofing at all buildings approx. 167,000 sq. ft. (includes demolition of existing roofing) 2) All MEPFP services and installation 3) Lighting and Mechanical Equipment Packages o Phase 1: Includes all removal of site concrete/paving, landscaping, and exiting utilities. Also includes all mass site grading, grading for foundations, new onsite and offsite utilities, and paving at Area 1. o Phase 2: Includes grading for site paving and lime stabilization, Area 3 storm detention pond C, and site paving and sidewalks in Areas 2, 3, and 4. o Phase 3: Includes backfill of curbs and spread of topsoil and final set to grades and trim out for utilities RFIs Due : Mar 2, 2021 at 1:00 PM EST **Total Project Value = $57,000,000

Post-Bid

Educational

$57,000,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

84

37

49

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
172
Bidding Soon
3,920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

June 10, 2021

Project location map

10115 Midway Rd, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.