BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2023 at 8:00 PM

Updated January 27, 2024

Demolition, site work, renovation and addition to a mixed-use development in Waukesha, Wisconsin. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; for site work for a municipal facility; and water / sewer project.

Project involves construction of Well Station No. 5 HMO treatment facilities, building modifications, reservoir rehabilitation, garage addition, well pump replacement, and associated work. The Project Manager for this Project is David Arnott, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542- 5733, regarding the Project. All Work is included in a single prime contract. All Work is included in a single prime contract. Prequalification Required - Yes. Estimated Value: $2,907,000 Completion Date: 05/15/2022. Bid proposals from Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and other Disadvantaged Business Enterprises (DBE) are encouraged. DBEs, including MBEs and WBEs, who are prime bidders on the project must meet the same solicitation requirements unless the contract amount is in an amount equal to or greater than the applicable fair share objectives. The project will be funded in part by a loan from the SDWLP. Any contract or contracts awarded must comply with P.L. 113-76, Consolidated Appropriations Act, 2014 (Act) that includes an "American Iron and Steel (AIS) requirement in Section 436 that requires the use of iron and steel products that are produced in the United States for projects for the construction, alteration, maintenance, or repair of facilities funded by the SDWLP. A Bidder's qualification statement must be delivered to the City of Pewaukee at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to the City of Pewaukee equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the City of Pewaukee as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The City of Pewaukee reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes.

Award

Water / Sewer

$2,558,070.00

Public - City

Addition, Demolition, Renovation, Site Work

65

33

6

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
238
Bidding Soon
2,185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2021

June 21, 2021

Project location map

W226 H 930 NORTH MOUND DR, Waukesha, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.