Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2022 at 7:00 PM
Updated January 26, 2024
Demolition, site work, remodeling and renovation of a medical facility in Columbia, Missouri. Working plans call for site work for a medical facility; for the remodel of a 5,800-square-foot, 16-bed medical facility; for the demolition of a medical facility; and for the renovation of a medical facility.
The University of Missouri-Columbia is requesting qualifications from firms to provide Construction Manager at Risk (CMR) with guaranteed maximum price services for a Missouri Psychiatric Center Infrastructure and ED Observation Renovation. This project shall have a Supplier Diversity participation goal of 10% MBE and 3% WBE/Veteran/ServiceDisabled Veteran/DBE of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. The project generally consists of the demolition and remodel of approximately 5,800 SF of the 1st floor of Missouri Psychiatric Center, along with providing and installing new infrastructure equipment which will serve the remodeled area. (Note: The emergency power infrastructure work is sized to support the entire MPC building in the future.) The remodeled area will become a 16-bed ED/Obs unit consisting of 23-hour patient rooms, caregiver stations, and other support spaces, i.e., clean room, soil room, etc. The infrastructure equipment includes a new roof top unit, exterior ductwork from the roof to the first floor, new ground mounted emergency generator and fuel tank, and new transfer switches and main distribution gear located in the basement. Additionally, chilled water pumps are being replaced in the basement as well. The work will be done in an occupied psychiatric facility and necessitate increased security and safety protocols for all working on the project. The project will be dividing into several phases on the first floor to accommodate shifting occupancies and allow continuous operation of the facility during construction. The project budget is $6,079,260.
Final Planning
Medical
$6,079,260.00
Public - State/Provincial
Demolition, Remodeling, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
