BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2021 at 8:00 PM

Updated April 15, 2024

Site work and renovation of a power facility in Moorhead, Minnesota. Completed plans call for the renovation of a power facility; and for site work for a power facility.

As of 4/8/2021 project was already awarded for $283,081.85. The general nature of the work on which bids will be received consists of modifications to the existing Centennial substation that includes relocating and rewiring certain equipment including a 115 kV breaker, CVT's and steel structures. This also includes concrete foundations, conduit, grounding, control cable, to the associated equipment. This also includes the installation of Owner-furnished group operated switches and steel structures.

Award

Power Plant

$283,082.00

Public - City

Renovation, Site Work

30

16

4

8

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
19
Bidding Soon
258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

May 15, 2021

Project location map

To Be Determined, Moorhead, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.