Site work and paving for a mixed-use development in Coleman, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 20, 2021, the project was split into two contracts. For Contract A-21, it was awarded to Sommers Construction Co., Inc. and for Contract B-21, it was awarded to MCC, Inc. ** The Contractors are to start in May and complete in June. Roadway excavation and reconstruction, including the addition of curb and gutter along Elm Drive from 150-feet west of Hammes Avenue to Park Avenue. The work, in general, will include the approximate quantities and items listed below: Contract A-21: 1,300 LF - Concrete Curb and Gutter. 600 SF - Concrete Driveway. Contract B-21: 1,900 SY - Hot Mix Asphalt Pavement. 40 SY - Hot Mix Asphalt Driveway. Each contract shall be bid and awarded separately. One project manual will be developed for the project including both Contract documents. Contract A-21: A. The Work will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 10 calendar days after the date when the Contract Times commence to run. B. All the Work in Contract A-21 will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions by June 11, 2021. Contract B-21: A. The Work may begin seven (7) days after the installation of concrete curb and gutter and a two weeks' notice has been issued by the Village. B. The Work will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 10 calendar days after the date when the Contract Times commence to run. C. All the Work in Contract A-21 will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions by July 1, 2021.

Award

Roads / Highways

$62,123.00

Public - City

Paving, Site Work

4

11

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
22
Bidding Soon
294
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2021

April 9, 2021

img_map_placeholder

Elm Dr, Coleman, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.