BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a civil project in Baldwin, Wisconsin. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of August 4 2021 there is no awarded bidder. Budget: $15M - $16M Furnishing of all labor and material for the construction of the following Lump Sum Items: Administration Building and Garage Grit Removal Clarifiers Blowers Sludge and Centrate Storage Tanks SCADA and Controls Multiple Buildings Fine Screens Oxidation Ditch Sand Filters Sludge Thickening System Pumping Stations Site Grading and Stormwater Management Bid security in the amount of 10 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Use of American Iron and Steel: The Contract requires the use of American Iron and Steel products. Iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. Contractor will be required to provide Owner documentation of the use of American Iron and Steel. Contractors on the Project shall be required to comply with the minimum wages and labor standards, and conditions of employment to be observed, as determined by the Federal Davis-Bacon wage rates, under the Contract. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under contract. Equal Opportunity and Affirmative Action requirements apply to this Project (E.O. 11246). The Owner encourages MBEs, WBEs, and SBRAs to submit Bid proposals. The Village of Baldwin reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Village. The Work will be substantially completed on or before March 31, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 31, 2023

Award

Water / Sewer

$15,024,579.00

Public - City

New Construction, Renovation, Site Work

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
47
Bidding Soon
790
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2021

September 23, 2021

img_map_placeholder

To Be Determined, Baldwin, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.