Site work and paving for a road / highway in Sumter, South Carolina. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of April 10, 2024, right-of-way is complete. Per owner, design team has been identified. Project is being bundled with Bridge Replacement Project S-55 (Miller Road) over Shot Pouch Branch #6349733. The anticipated letting date was recently moved from late 2024 to early 2025, so the project can be bundled with the S-55 project. SCDOT - Manning Avenue Revitalization Plan Project The Sumter Urban Area Transportation Study Metropolitan Planning Organization (SUATS MPO), in partnership with the Sumter City-County Planning Department, the South Carolina Department of Transportation (SCDOT) and the U.S. Federal Highway Administration, is proposing revitalization improvements along the S-152 (Manning Avenue) corridor from S-140 (Watkins Street) to US 15 (South Lafayette Drive) in Sumter County, South Carolina. The project team is in the process of developing a conceptual revitalization plan which may include, but is not limited to, improved pedestrian facilities within the project corridor. The project will also include safety and accessibility improvements, address roadway deficiencies, and consider landscaping and lighting. Americans with Disabilities Act (ADA) upgrades at pedestrian crossings, including improved curb ramps and accessible push buttons will also be included. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Roads / Highways
$6,832,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
S- 152, Sumter, SC
Related To This Project
Sumter, SC
Bid Date: Jan 12 2023
Sumter, SC
--
Sumter, SC
Bid Date: Dec 16 2021
Sumter, SC
Bid Date: Mar 08 2022
Sumter, SC
Bid Date: Apr 28 2022
Sumter, SC
Bid Date: May 12 2022
Sumter, SC
--
Sumter, SC
Bid Date: Dec 20 2022
Sumter, SC
Bid Date: Dec 20 2022
Sumter, SC
Bid Date: Nov 21 2022
Sumter, SC
Bid Date: Nov 22 2022
Sumter, SC
Bid Date: Dec 13 2022
Sumter, SC
Bid Date: Dec 08 2022
Sumter, SC
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.