Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Utica, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
For Long Term Control Plan - Tonti. LaHarpe. Zinc Streets and Porter Avenue Storm Sewer Separation - 2021 The proposed work is officially known as "Long Term Control Plan. Tonti. LaHarpe. Zinc Streets & Porter Ave. Storm Sewer Separation - 2021". and further described as storm sewer installation on Tonti, LaHarpe, Sterling, 14th, 15th Zinc & Roosevelt Streets and Porter Ave. Work shall include, but not limited to the installation of 1650 feet of 12" PVC storm sewer, 706 feet of 15" PVC storm sewer, 1237 feet of 18" PVC storm sewer, 2864 feet of 24" PVC storm sewer, 31 manholes varying from 4' diameter to 7 diameter, 58 inlets, concrete driveway replacement, concrete sidewalk replacement, pavement patching, concrete curb and gutter, surface restoration, including all other work as further described in the plans and specifications for said work prepared by the City of LaSalle. Additionally, 2170 tons of hot-mix asphalt, 15,400 square yards of asphalt surface removal, additional concrete driveway replacement, concrete curb and gutter will be bid as an alternate. A certified check or bank draft, payable to the order of the City of La Salle or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The successful bidder for the construction of the improvements will be required to enter into a bond equal to 100% of the amount of the bid with sureties to be approved by the Mayor and City Council, when entering into the contract for construction of the improvements, which shall be conditioned upon the proper and faithful performance by the contractor of the work specified in accordance with the plans and specifications thereof. The City of La Salle reserves the right to reject any or all Bids or to waive any informalities in the bidding. Bids may be held by the City of La Salle for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. goals- MBE (18.4%), WBE (6.9%)
Bid Results
Water / Sewer
$1,112,241.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2021
April 9, 2021
Multiple Locations, Utica, IL
Related To This Project
Utica, IL
Bid Date: Jan 05 2022
Utica, IL
Bid Date: Feb 17 2022
Utica, IL
Bid Date: Feb 21 2024
Utica, IL
Bid Date: Apr 02 2024
Utica, IL
Bid Date: Mar 04 2024
Utica, IL
Bid Date: Mar 20 2024
Utica, IL
Bid Date: Sep 20 2021
Utica, IL
Bid Date: Jun 20 2023
Utica, IL
Bid Date: Jun 06 2023
Utica, IL
Bid Date: Sep 06 2023
Utica, IL
Bid Date: Apr 19 2023
Utica, IL
Bid Date: Apr 06 2023
Utica, IL
Bid Date: Feb 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.