BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Palm Beach, Florida. Completed plans call for site work for a water / sewer project.

Contractor shall furnish and assume full responsibility for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), materials, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit and other incidentals necessary to perform the Work, as shown on the construction plans titled "Georgia Ave (Forest Hill Blvd to Dobbins St) Sanitary Sewer and Stormwater Pipeline Rehabilitation" ("Project") dated June 2022 and associated technical specifications. This work includes the rehabilitation of the gravity sewer and stormwater system at various locations consisting generally of, but not limited to, installation of cure-in-place sewer pipe lining, restoration of service line connections into the existing sewer mains, rehabilitation of selected manholes pipe replacement and point repairs, site restoration, supplementary cleaning of the affected stormwater and gravity sanitary sewers, isolating the reach of sewer to rehabilitated and/or replaced, inspection via i closed circuit television (CCTV) and cleanup. The work in the storm and sanitary sewer shall be accomplished through the manholes, without disturbing the street surface or adjacent property or any utility, except when performing excavated point repairs. The work covered by these specification comprise, in general, the furnishing of all labor, equipment, materials, and performing all operations to construct road improvements, as well as, water, sewer, and drainage improvements for the City of West Palm Beach as described and specified further in the technical specification and as shown on the contract drawings. No less than 5% of bid amount Questions or requests for information regarding this solicitation should be addressed only to:City of West Palm Beach Procurement Division West Palm Beach City Hall 401 Clematis Street West Palm Beach, FL 33401 Rick Little, Procurement Specialist II Email: rdlittle@wpb.org Dir: 561-822-2107 Main: 561-822-2100 Project Location and Background: The Project is located on Georgia Avenue in the between Forest Hill Blvd and Dobbins Street. Georgia Avenue is a local primary street with a 50-foot wide public road right-of-way that runs north and south from the southernmost City limit to N street. The right-of-way limits are, in general, from the back of the existing east and west sidewalks. The existing concrete curb & gutter (Type F), sidewalk (5-ft wide), and driveways within the project limits are in good condition. The project falls within an industrialized area surrounded by residential housing with numerous auto body and repair shops utilizing on-street parking on either side of the street. Site: Georgia Avenue in between Forest Hill Blvd and Dobbins Street, West Palm Beach, FL, 33401 Final Questions Due February 8, 2024 at 5:00 p.m. Pre-Bid Conference January 26, 2024, 10:00 am 401 Clematis Street, 5th Floor, Room 519 West Palm Beach, FL 33401

Bid Results

Water / Sewer

$3,365,609.00

Public - City

Site Work

23

10

6

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
65
Bidding Soon
1,137
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 29, 2024

img_map_placeholder

Georgia Ave, West Palm Beach, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.