Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Union Grove, Wisconsin. Completed plans call for the renovation of a municipal facility.
Only bidders who have been certified by DOA as a qualified and responsible bidder in the Mechanical division of work may bid on this project. This project is being let using a new single trade bidding and contracting process. When 85% or more of the construction cost of a project could be completed by a Single Trade Contractor (mechanical, electrical, plumbing, or fire protection), the Department may bid and contract all work of that construction project directly to a Single Trade Contractor. The State will enter into a single contract with the lowest, qualified, responsible, certified single trade MEP contractor. Single trade MEP contractors may bid on single trade projects up to their current division of work certification level for that trade. All Work for this project will be awarded to a single trade Mechanical contractor. Bidders shall submit a Single Base Bid for all Work. Items of note about the pre-bid walkthrough: a. Contractors are to meet at the Wallace Hall Lobby at 9:30 A.M. Contractors will be screened in the30 lobby and provided a surgical mask that they must wear. b. The group will be escorted to the Boiler Plant to discuss the project. c. Only one (1) representative per contractor will be allowed for the pre-bid. In general the work consists of replacing the burners and controls on select equipment at the heating plant. This includes replacing local controls on 3 natural gas and fuel oil boilers. The new Balance of Plant control system will control all boilers, boiler auxiliary equipment and monitor the existing water wells at SWC. All field instruments will be replaced with current technology. The burners and burner management system for Boilers #2 and #3 will be replaced. The new burners will have increased turndown capacity so that the boilers can operate efficiently year-round. Mud drum heaters will be added to 3 boilers. A new central air compressor system will be added to serve the plant, boiler burners and the campus air needs. Finally, this project will repair the inner and outer casing, insulation, and refractory on three side of boiler #2. Base Bids will be received as follows: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.
Bid Results
Municipal
$3,462,781.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 7, 2022
November 7, 2022
March 1, 2024
21425 Spring St, Union Grove, WI
Related To This Project
Union Grove, WI
Bid Date: Feb 08 2024
Union Grove, WI
Bid Date: Sep 06 2022
Union Grove, WI
Bid Date: Sep 13 2022
Union Grove, WI
Bid Date: May 30 2023
Union Grove, WI
Bid Date: Mar 24 2022
Union Grove, WI
Bid Date: Mar 07 2023
Union Grove, WI
Bid Date: Feb 03 2023
Union Grove, WI
Bid Date: Jan 31 2023
Union Grove, WI
Bid Date: Jul 21 2022
Union Grove, WI
Bid Date: Aug 14 2019
Union Grove, WI
Bid Date: Jul 13 2022
Union Grove, WI
Bid Date: Jan 18 2022
Union Grove, WI
Bid Date: Jul 25 2023
Union Grove, WI
Bid Date: May 17 2022
Union Grove, WI
Bid Date: May 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--