BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2021 at 7:00 PM

Updated October 24, 2023

Site work for a playground / park / athletic field in Mentor, Ohio. Completed plans call for site work for a playground / park / athletic field.

We would like to replace the existing entrance gate and exit gates at Headlands Beach State Park with automated gates to control traffic flow. SWING GATE Two (2) double swing gates (bi-parting) Approximately 24 feet per pair Flat-top, 6 foot high Metal with black finish Four (4) six-foot high steel post Include hanging/hinging hardware. Any and all consideration for automation Swinging motion Automation attachment locations Project to be installed and fully operational by May 31, 2021.

Award

Playgrounds / Parks / Athletic Fields

$53,400.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
119
Bidding Soon
1,852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2021

April 5, 2021

Project location map

9601 Headlands Rd, Mentor, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.