Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a bridge / tunnel in Jasper, Georgia. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
0.085 Mile of Construction of a Bridge and Aproaches on Fairview Rd (Cr 85) Over Polecat Branch. Counties: Pickens District: District 6 - Cartersville, Area Office 1 -Cartersville All questions and comments must be submitted by the close of business of the Friday two weeks before the letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For those contractors who are currently prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor through GDOT's Construction Bidding Administration Office, and want to be prequalified to perform maintenance projects under the Routine Maintenance Services Program, there is now a modified prime contractors application form available. W e welcome you to participate. The application form and all applicable documents, resources and other guidance may be found on the GDOT website. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or comments call (404) 631-1147 GADOT - 013 - Construction of a Bridge and Aproaches on Fairview Road (CR 85) This project involves the replacement of the existing CR 85 (Fairview Road) bridge over Polecat Branch located approximately 5 miles South of Jasper in Pickens County, Georgia. The new bridge is proposed to be a three-span, fourbent structure, approximately 100 feet long and 27 feet wide, supporting one traffic lane in each direction. The new bridge will be constructed along the existing alignment. Fairview Road will be closed to traffic during the proposed construction. Traffic will be maintained by utilizing an off-site detour
Award
Bridges / Tunnels
$932,535.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2021
November 22, 2021
Fairview Rd, Jasper, GA
Related To This Project
Jasper, GA
Bid Date: May 20 2019
Jasper, GA
Bid Date: Jul 06 2022
Jasper, GA
Bid Date: May 04 2022
Jasper, GA
Bid Date: May 04 2022
Jasper, GA
Bid Date: Jun 28 2022
Jasper, GA
Bid Date: Aug 18 2022
Jasper, GA
Bid Date: Jun 18 2024
Jasper, GA
Bid Date: May 17 2022
Jasper, GA
Bid Date: Mar 18 2022
Jasper, GA
Bid Date: Jan 11 2023
Jasper, GA
Bid Date: Dec 20 2022
Jasper, GA
Bid Date: Dec 16 2022
Jasper, GA
Bid Date: Nov 07 2022
Jasper, GA
Bid Date: May 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.